My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2017-096
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2017
>
Reso 2017-096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2017 1:52:30 PM
Creation date
7/24/2017 1:09:12 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
7/17/2017
Retention
PERM
Document Relationships
_CC Agenda 2017 0717 CS + RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2017\Packet 2017 0717
5A Public Hearings 2017 0717
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2017\Packet 2017 0717
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SAN LEANDRO <br />RE: Exhibit A -CONSISTENCY MEMORANDUM FOR THE SLTC MIXED-USE PROJECT (PLN16-oo67) <br />JULY 17, 2017 <br />EIR to reduce TOD buildout impacts. The San Leandro General Plan and General Plan EIR was updated <br />in 2016; therefore, the third column of Table 3lists the updated corresponding General Plan policies and <br />mitigation measures applicable to the project. The project would implement the updated 2o16 policies <br />and mitigation measures listed below to reduce potential project impacts. <br />PotentialTable 3: Relevant .- <br />Potential Impact 2002 General Plan Policies/MitigationCorresponding 2016 General. Plan Compliance <br />Measures* and 2007 TOD Strategy EIR Policies/Mitigation Measures <br />Mitigation Measures.. - <br />AirQuality ,.. <br />Implementation of <br />General Plan Policy 31.01: Cooperate <br />General Plan Policy EH -3.1: Cooperate <br />The project would comply <br />the TOD Strategy <br />with the appropriate regional, state, and <br />with the appropriate regional, state, and <br />with appropriate regional, <br />could result in <br />federal agencies to implement the <br />federal agencies to implement the <br />state, and federal agencies <br />significant impacts if <br />regional Clean Air Plan and enforce air <br />regional Clean Air Plan and enforce air <br />to reduce project impacts. <br />it is not consistent <br />quality standards. <br />quality standards. <br />See the Air Quality <br />with Clean Air Plan <br />discussion below. <br />projections. <br />General Plan Policy 31-02: Promote <br />Mitigation Measure AQ -2A: Prior to <br />An Air Quality technical <br />strategies that help improve air quality <br />issuance of construction permits, <br />assessment evaluating <br />by reducing the necessity of driving. <br />development project applicants that are <br />potential project -related air <br />These strategies include more reliable <br />subject to CEQA and exceed the <br />quality impacts in <br />public transportation, programs for <br />screening sizes in the Bay Area Air <br />comparison to BAAQMD <br />carpooling and vanpooling, better <br />Quality Management District's <br />thresholds of significance <br />provisions for bicyclists and pedestrians, <br />(BAAQMD) CEQA Guidelines shall <br />showsthe project is in <br />and encouraging mixed-use and higher <br />prepare and submittothe City of San <br />compliance with MM AQ -2A <br />density development around transit <br />Leandro a technical assessment <br />and -2B. See the Air Quality <br />stations. <br />evaluating potential air quality impacts <br />discussion below. <br />related to the project's operation phase. <br />TOD EIR Mitigation Measure qQ-2: <br />The evaluation shall prepared in <br />Priorto adoption of the Strategy, the City <br />conformance with thee BAAQMD <br />should coordinate with CARIB to confirm <br />n <br />assess <br />method. <br />logy <br />what feasible and relevant strategies <br />criteria air <br />impacts. operation -related criteria <br />Ifop <br />from the EPA Climate and Action Team <br />soperation-related <br />pollutants are determined have the <br />report would apply to implementation of <br />A <br />potential to exceed the BAAQMD <br />the Strategy. The City should then <br />thresholds significance; as identified <br />identify the appropriate policy <br />in BAAQMD's CEQA Guidelines, the City <br />framework (e.g., General Plan <br />of Leandro Community <br />Amendment or Municipal Ordinance) for <br />Development Department shall require <br />Development <br />adopting these strategies. <br />that applicants for new development <br />projects incorporate mitigation <br />measures to reduce air pollutant <br />emissions during operation activities. <br />Mitigation Measure AQ -2B: As part of <br />the City's development approval <br />process, the City shall require applicants <br />forfuture development projects to <br />comply with the current Bay Area Air <br />Quality Mana ement District's basic <br />
The URL can be used to link to this page
Your browser does not support the video tag.