My WebLink
|
Help
|
About
|
Sign Out
Home
8F Consent 2020 0903
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2020
>
Packet 2020 0908
>
8F Consent 2020 0903
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2020 7:11:20 PM
Creation date
9/2/2020 7:10:40 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
9/8/2020
Retention
PERM
Document Relationships
Reso 2020-109 903 CSA Ethosoft Inc for Laboratory Information Mgmt System
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />RFP No. 58205 Page 6 of 39 <br /> <br />Deliverables: <br />• Model of current data and lab operational processes that City staff agrees <br />accurately represents the current system. <br />• Proposed model for using the LIMS to improve operational efficiency that <br />City staff agrees will function properly. <br /> <br /> <br />Task 2.3: Installation, Configuration and Implementation <br />The Contractor will install or provision an instance of the LIMS. The Contractor <br />will use the data model produced in Task 2 to configure the LIMS. The <br />Contractor will set up any synchronization processes to move data between the <br />LIMS and the other data systems. <br /> <br />Deliverables: <br />• Installed LIMS available for City staff to use. <br />• LIMS configured according to the specifications in the data model. <br />• Training for City staff to successfully test and review the system. <br />• Data synchronization software installed data successfully synchronizing <br />between the LIMS and other data systems. <br /> <br />Task 2.4: Testing and Revised Implementation <br />The Contractor will use the testing and review feedback from Task 2.3 to make <br />necessary modifications to provide a fully-functioning LIMS system. <br /> <br />Deliverables: <br />• Provide final application. <br />• Training and rollout. <br />• Functioning LIMS system as accepted by City staff <br /> <br /> <br />Task 2.5: Historical data conversion <br />Historical lab data is stored in an installation of Hach WIMS. The City would like <br />to transfer five years of historical data into the LIMS to provide continuity of <br />reporting. The Contractor will extract data from the WIMS and import it into the <br />LIMS. <br /> <br />Deliverable: <br />Five years of historical laboratory data available for reporting in the LIMS. <br /> <br />Task 2.6: Integration of EBDA data <br />The City of San Leandro LIMS may become the central repository for regulatory <br />lab data for the EBDA system. The Contractor will provide a project plan for <br />efficiently gathering the data from other EBDA member agencies, storing the data <br />in the LIMS, and effective reporting into CIWQS. This may include incorporation <br />of historical EBDA data comparable to Task 2.4. Once the City and EBDA <br />2262
The URL can be used to link to this page
Your browser does not support the video tag.