Laserfiche WebLink
City of San Leandro <br />2824 Halcyon Drive Residential Project <br /> <br />18 <br />increasing the housing density on the project site and re-zone the site so it is fully residential and <br />consistent with the surrounding residential land uses to the east and south. <br />CEQA Guidelines Updates <br />The California Governor’s Office of Planning and Research (OPR) updated the CEQA Guidelines <br />effective December 2018; however, it should be noted that the General Plan EIR was certified prior <br />to these changes to the CEQA Guidelines and used the older checklist questions. The Appendix N <br />checklist questions from the updated CEQA Guidelines are utilized in this analysis. Specifically, <br />impacts related to energy are discussed in Section 6, Energy, impacts related to tribal cultural <br />resources per Assembly Bill (AB) 52 of 2014 are discussed in Section 18, Tribal Cultural Resources, <br />and impacts related to wildfire are analyzed in Section 20, Wildfire. <br />The updated CEQA Guidelines and Senate Bill (SB) 743 changed the criteria for determining what <br />constitutes a significant transportation-related environmental impact based upon quantification of <br />vehicle miles traveled (VMT) instead of level of service. CEQA Guidelines Section 15064.3(c) states <br />the requirement to use the VMT criteria only applies on and after July 1, 2020. <br />The following checklist of “environmental factors potentially affected” should be viewed in the <br />context of General Plan EIR, which provided program-level analyses and “[do] not assess site- <br />specific impacts.” <br />This report presents the written checklist with references to the specific portions of the General <br />Plan EIR that contain the analysis of the project's potential significant effects, including page and <br />section references. For this reason, this analysis begins with reference to the project description in <br />the General Plan EIR to demonstrate that the project is generally included in the overall plan area <br />buildout described in the project description for the General Plan EIR. It should also be noted that all <br />applicable mitigation measures from General Plan EIR have either been incorporated into the <br />project or would be included in its Mitigation Monitoring and Reporting Program and, if the project <br />is approved, its Conditions of Approval. <br />