Laserfiche WebLink
Environmental Checklist <br />Aesthetics <br />Environmental Consistency Checklist Pursuant to CEQA Guidelines Section 15183 19 <br />1 Aesthetics <br />Significant <br />Impact <br />Less Than <br />Significant or <br />Less than <br />Significant with <br />Mitigation <br />Incorporated <br />No <br />Impact <br />Analyzed <br />in the <br />Prior EIR <br />Substantially <br />Mitigated by <br />Uniformly <br />Applicable <br />Development <br />Policies <br />Except as provided in Public Resources Code Section 21099, would the project: <br />a.Have a substantial adverse effect <br />on a scenic vista?□□ ■■ □ <br />b.Substantially damage scenic <br />resources, including but not <br />limited to, trees, rock <br />outcroppings, and historic <br />buildings within a state scenic <br />highway?□□ ■■ □ <br />c.In non-urbanized areas, <br />substantially degrade the existing <br />visual character or quality of <br />public views of the site and its <br />surroundings? (Public views are <br />those that are experienced from <br />publicly accessible vantage <br />point). If the project is in an <br />urbanized area, would the project <br />conflict with applicable zoning <br />and other regulations governing <br />scenic quality?□■□■□ <br />d.Create a new source of <br />substantial light or glare that <br />would adversely affect daytime <br />or nighttime views in the area?□□ □■ ■ <br />Analysis in Previous Environmental Document <br />Impacts to aesthetics were analyzed on pages 4.1-8 through 4.1-19 of the General Plan EIR. Impacts <br />to aesthetics were determined to be less than significant. <br />The following describes the analysis included in the General Plan EIR (the General Plan EIR) and also <br />provides a streamlined review to determine whether there would be project-specific impacts that <br />are either 1) peculiar to the project or the parcel on which the project is located, 2) were not <br />previously analyzed in the General Plan EIR as significant effects, 3) are potentially significant off-site <br />impacts and cumulative impacts that were not previously discussed in the General Plan EIR, and 4) <br />are now determined to have a more severe impact than discussed in the General Plan EIR due to <br />substantial new information.