My WebLink
|
Help
|
About
|
Sign Out
Home
13a Action Item
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2022
>
Packet 11212022
>
13a Action Item
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 3:06:32 PM
Creation date
11/22/2022 11:32:03 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
11/21/2022
Retention
PERM
Document Relationships
Reso 2022-201 Crosstown Corridor Study
(Amended)
Path:
\City Clerk\City Council\Resolutions\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 CROSSTOWN CORRIDORS DESIGN VISION <br /> San Leandro Crosstown Corridors Study 3-10 <br />3.3 Williams Street <br />The design vision on Williams Street focuses on connecting San Leandro <br />neighborhoods to the Bay Trail as well as improving access to schools for <br />people walking, biking, and taking transit by providing two-way separated <br />bike lanes on the north side of the street. Unlike Bancroft Avenue, the proposed <br />bikeway will not have parking protected segments—instead, parking will be <br />located on the opposite (southern) side of Williams Street and the bikeway is <br />protected by concrete buffers and landscaping where there is sufficient width. <br />New crosswalks support pedestrian safety along and across Williams Street, <br />while signal and bus stop improvements at intersections support multimodal <br />safety and access. Changes in parking are described with each segment cross <br />section and provided in detail in Appendix F. <br /> Figure 3-2 Williams Street Design Vision DRA <br />F <br />T
The URL can be used to link to this page
Your browser does not support the video tag.