My WebLink
|
Help
|
About
|
Sign Out
Home
Rubicon Landscape Corporation NPSA 20231016
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2023
>
Rubicon Landscape Corporation NPSA 20231016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 1:28:44 PM
Creation date
12/4/2023 5:27:54 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
10/16/2023
Retention
PERM
Document Relationships
Reso 23-141 NPSA Rubicon Landscape for Median Maintenance
(Amended)
Path:
\City Clerk\City Council\Resolutions\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the Irrigation Plan and submitted to the City within five working days of the completion of <br />the work. <br /> <br />506 Repair and replace , After the Lateral Tee and Extra Work <br /> <br />(a) All irrigation parts and materials which are damaged or broken shall be reported to the <br />City. Upon request, Contractor shall then submit in writing a written proposal for repair <br />and/or replacement. A City representative shall then determine if work shall be done by <br />Contractor or a City crew. <br /> <br />(b) Contractor is responsible for any damage caused by Contractor. For any repair work <br />performed by the City, which is at fault by the Contractor, shall be charged against the <br />Contractor’s monthly account (Contractor shall have opportunity to perform repairs, which <br />meet the City’s irrigation standards, first). If the contractor agrees to perform extra <br />irrigation work, it must be performed within 48 hours of the request unless otherwise <br />specified by the City and agreed to by the contractor. <br /> <br />(c) If the work is not performed within the agreed upon time frame the repair cost may be <br />withheld from the monthly payments. This work normally includes broken sp rinklers, <br />lateral lines and occasionally mainlines. When lateral and mainline repairs are made, the <br />City must be given the opportunity to inspect the work before it is covered up. The <br />contractor shall take pictures of the broken pipe or fittings, before an d after the work is <br />performed and provide the photos to the Parks Supervisor. <br /> <br />(d) If a City representative is not available to inspect the work and photos are not taken of the <br />work the contractor may be required to uncover the work so that it can be inspecte d at no <br />extra cost to the City. Replacements of irrigation equipment shall match existing equipment <br />of the same size and quality or substitute with current standard equipment if the damaged <br />equipment is antiquated, as approved by the project manager prior to any installation. <br /> <br />Exhibit A <br />Page 39 of 55 <br />DocuSign Envelope ID: DEF5307A-6F44-4C74-86C2-5E2B3E67B647
The URL can be used to link to this page
Your browser does not support the video tag.