My WebLink
|
Help
|
About
|
Sign Out
Home
5G Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2023
>
Packet 20231204
>
5G Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2024 5:57:36 PM
Creation date
12/26/2023 3:30:31 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
12/4/2023
Retention
PERM
Document Relationships
ConvergeOne, Inc. CSA 20231204
(Amended)
Path:
\City Clerk\City Council\Agreements\2023
Reso 23-173 2023 Resolution CSA ConvergeOne
(Amended)
Path:
\City Clerk\City Council\Resolutions\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> 14 <br />9. MILESTONE AND/OR PROJECT ACCEPTANCE <br />Upon completion of the services described in this SOW, ConvergeOne shall provide the Customer with <br />an Acceptance Form. Upon delivery of the Acceptance Form, the Customer has 5 working days to <br />review and accept. Failure to respond within the designated 5 day period, signifies the completion of <br />the milestone or project. To refuse acceptance, the Customer must both indicate non -acceptance with <br />written notification to ConvergeOne within the 5 day period noted above and describe why it was not <br />accepted. ConvergeOne shall have up to 10 days after the receipt of such notice to correct the error <br />given it is within ConvergeOne scope and control to do so. The period to cor rect the error may be <br />extended by mutual consent. <br /> <br />10. CUSTOMER RESPONSIBILITIES <br />10.1. Provide a single point of contact that will be responsible for: <br />• Understanding the business process impact and technical requirements and who has the <br />authority to make binding decisions on the Customers behalf. <br />• Working with ConvergeOne Project Manager to develop mutually agreed project <br />schedule, including outside of Normal Business Hours test and cutover windows (if <br />applicable). <br />• Ensuring all Customer responsibilities are complet ed in accordance with the project <br />schedule. <br />• Reasonable notification of schedule and changes for the installation work. <br />• Attending all project status meetings. <br />10.2. Site Preparation: <br />• Ensure the equipment room is ready, including all electrical, wiring, grounding, lighting, <br />racks, and HVAC required to maintain equipment within operating conditions specified by <br />the equipment manufacturer. <br />• Provide required cable/patch panels that meet all requirements for Category 5e, racks, and <br />network connectivity. <br />• Accept receipt of equipment and store it in a secure area. Retain shipping documentation, <br />and inventory shipments by box count, and report any apparent external damage to the <br />ConvergeOne Project Manager. <br />• Provide floor plans for equipment room configuration and related locations if applicable. <br />• Ensure that the existing Customer network is configured, connected, and operating within <br />the manufacturer's specifications.
The URL can be used to link to this page
Your browser does not support the video tag.