My WebLink
|
Help
|
About
|
Sign Out
Home
5B Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2025
>
Packet 20250106
>
5B Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2025 1:47:24 PM
Creation date
9/22/2025 1:20:42 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
1/6/2025
Retention
PERM
Document Relationships
Reso 2025-001 Cooperative Implementation Agreement with Caltrans
(Amended)
Path:
\City Clerk\City Council\Resolutions\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of San Leandro <br /> CIA No. D43CIASAL0001 <br />Attachment II, Page 5 of 9 <br /> <br /> <br /> <br />Figure 4: Site 14.2 Drainage Area <br />Each project (14.1 and 14.2) will utilize the storm drain master plan model for the City of San <br />Leandro for device sizing. The 1-year 1-hour storm event will be developed within the existing <br />model to determine trash flow rates and impacts due to head loss on the system during the 15- and <br />100-year event at the Full Capture System (FCS) location. Coordination with state approved FCS <br />device manufacturers will take place to obtain device and bypass head loss values, maintenance <br />information, and costs. Each approved FCS device will remove trash and debris before conveying <br />water to the existing ACFCD canal during a treatment flow event. <br />Each project will include a Memorandum of Understanding (MOU) or Maintenance Agreement <br />between the City and ACFCD for the long-term operation and maintenance of the constructed <br />water capture facility. <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.