Laserfiche WebLink
City of San Leandro <br /> CIA No. D43CIASAL0001 <br />Attachment II, Page 5 of 9 <br /> <br /> <br /> <br />Figure 4: Site 14.2 Drainage Area <br />Each project (14.1 and 14.2) will utilize the storm drain master plan model for the City of San <br />Leandro for device sizing. The 1-year 1-hour storm event will be developed within the existing <br />model to determine trash flow rates and impacts due to head loss on the system during the 15- and <br />100-year event at the Full Capture System (FCS) location. Coordination with state approved FCS <br />device manufacturers will take place to obtain device and bypass head loss values, maintenance <br />information, and costs. Each approved FCS device will remove trash and debris before conveying <br />water to the existing ACFCD canal during a treatment flow event. <br />Each project will include a Memorandum of Understanding (MOU) or Maintenance Agreement <br />between the City and ACFCD for the long-term operation and maintenance of the constructed <br />water capture facility. <br /> <br /> <br /> <br /> <br /> <br /> <br />