My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2014 The Planning Center DC&E
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2014
>
Agmt 2014 The Planning Center DC&E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2014 1:22:50 PM
Creation date
3/26/2014 1:22:44 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
3/3/2014
Retention
PERM
Document Relationships
Agmt 2015 The Planning Center DC&E (Placeworks)
(Amended by)
Path:
\City Clerk\City Council\Agreements\2015
Agmt 2017 Amend No. 4 The Planning Center DC&E (Placeworks)
(Amended by)
Path:
\City Clerk\City Council\Agreements\2017
Reso 2014-022
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SAN LEANDRO <br /> SAN LEANDRO GENERAL PLAN UPDATE AND HR <br /> E X H I B I T A: S C O P E O F WORK AND COSTS <br /> service will be described,including routes and frequency of service, and presented <br /> graphically. Information regarding existing bicycle facilities will be obtained from <br /> the 2010 San Leandro Bicycle and Pedestrian Master Plan and confirmed in the <br /> field. Nlaps in the Bicycle/Pedestrian Plan will be reproduced in a summary figure. <br /> Kittelson will review all the relevant documents to identify existing and planned <br /> transportation and circulation issues and improvements. Kittelson will use the <br /> relevant information in the background reports to develop baseline environmental <br /> conditions for transportation. This information will be available to City staff and <br /> will be used by Kittelson in the preparation of the traffic setting section of the EIR. <br /> This analysis will include a description of vehicular and alternative transportation <br /> facilities,such as roadways, bicycle lanes,trails,public transit routes and stops (bus <br /> and rail), and sidewalks. The study will include a discussion of the local and <br /> regional policies affecting circulation. Kittelson will also document existing levels <br /> of service at key City roadways and intersections and report daily volumes on City <br /> roadways. The current General Plan analyzed a total of 31 study intersections. If <br /> necessary, this will be supplemented by additional intersections, some that were <br /> studied as part of recent F_IR's, and potentially expanded up to 35 study <br /> intersections through coordination with City staff. The LOS will be performed for <br /> weekday AM and PM peak hour for each study area intersection. Results of the <br /> analysis will be described in the text and summarized in a Level of Service table. <br /> Copies of all calculations will be provided in a technical appendix. <br /> Current City traffic guidelines require that level of service be conducted using the <br /> HCM 2000 Methodology. Kittelson will coordinate with City staff whether to keep <br /> the analysis in HCM 2000 or update the methodology to more recent methods <br /> (HCM 2010). <br /> Based on the analysis described above relative to the applicable performance <br /> service standards for each facility analyzed, Kittelson will identify existing <br /> deficiencies in the study area. For facilities identified as deficient, Kittelson will <br /> confirm these with City (and Caltrans staff for state-owned facilities) based on <br /> empirical field observations and other traffic operations analyses that may have <br /> been performed for the same facility and location. <br /> In addition, Kittelson will conduct Multimodal LOS (MMLOS) using the 2010 <br /> HCM, as implemented by the CompleteStreets LOS software, for key segments of <br /> the E.14th Street corridor in San Leandro. This task will require collecting <br /> THE PLANNING CENTER I DC&E 15 <br /> MARCH 3.2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.