My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2014 The Planning Center DC&E
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2014
>
Agmt 2014 The Planning Center DC&E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2014 1:22:50 PM
Creation date
3/26/2014 1:22:44 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
3/3/2014
Retention
PERM
Document Relationships
Agmt 2015 The Planning Center DC&E (Placeworks)
(Amended by)
Path:
\City Clerk\City Council\Agreements\2015
Agmt 2017 Amend No. 4 The Planning Center DC&E (Placeworks)
(Amended by)
Path:
\City Clerk\City Council\Agreements\2017
Reso 2014-022
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C I T Y O F S A N L E A N D R O <br /> SAN LEANDRO GENERAL PLAN UPDATE AND EIR <br /> EXHIBIT A: SCOPE OF WORK AND COSTS <br /> circulation projects. In addition,two alternatives to the project, discussed later,will <br /> be analyzed at a more qualitative level (using comparative model output measures <br /> like trip generation). <br /> Kittelson will utilize the latest version of the Alameda CTC Countywide model <br /> with ABAG Projections 2009. This scope does not assume any enhancements will <br /> be made to the Alameda CTC Countywide model in terms of adding new zones or <br /> recalibration. This scope does not address the issue of baseline plus project <br /> conditions in light of recent CEQA court decisions, therefore the scope only <br /> covers an analysis of 2035 cumulative plus project conditions. <br /> Based on the forecasts produced by the Countywide travel model, Kittelson will <br /> perform future year build out traffic operations analyses for the Baseline and <br /> Preferred Alternative and will perform standard NCHRP-255 adjustments to <br /> minimize the inherent validation errors in the "raw" modeled forecast volumes. <br /> Kittelson will calculate highway segment, local roadways and intersections LOS <br /> using planned future year lane geometry, forecast traffic volumes, and intersection <br /> signal phasing(for future signalized intersections). Kittelson will review future year <br /> LOS forecast results for reasonableness relative to existing conditions and will <br /> identify future deficiencies in the study area. <br /> Kittelson will utilize the Countywide model to produce 2035 \'1∎I T estimates for <br /> the City of San Leandro using the Origin-Destination method under both the <br /> existing General Plan (No Project Alternative) and the proposed General Plan <br /> update. The information will be summarized by internal-internal, internal-external <br /> and external-internal to San Leandro, after removing of external-external <br /> components. This information, as well as speeds and fleet mix, will also be <br /> transmitted to The Planning Center I DC&E for the GHG analysis portion of the <br /> EIR. -Trip generation projections for the proposed General Plan will be <br /> determined and presented in a tabular format. <br /> As part of the CMP requirements to address the Alameda CTC guidelines, <br /> Kittelson will perform a separate roadway segment analysis that evaluates the <br /> impacts of the proposed General Plan Update on CAiP- and \11'S-designated <br /> routes and transit facilities identified by CTC staff in their NOP comments. <br /> An assessment of multimodal circulation will be provided relative to issues such as <br /> connectivity and alternative mode facilities. Impacts on multimodal circulation will <br /> be assessed based on the policies and goals set forth in the Transportation <br /> Element. Significant impacts to vehicular,pedestrian,bicycle and transit operation <br /> THE PLANNING CENTER I DC&E 41 <br /> MARCH 3,2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.